Installation of disposable liners with Injection tool with parallelogram
– 100×100 tubular frame – Double beam – Category II coupling head – Will be arranged on the rear: 3 universal drip hose reels with alus flanges for installation.
– On the rear beam: 3 Injection tool with parallelogram and skids to adjust the depth of the drip tape.
– On the front beam, 2 gauge wheels, adjustable in height and in height and in between axis to ensure a pre-adjustment of the height.
– The Drip tape installation machine and Injection tools will be mounted on flanges allowing the adjustment of the centre distance (example: 1200mm)
– You will have left and right drip feeders
Description of the hopper: Adjustable depth skid. Sheath guide over approximately 300 mm to avoid any twisting of the sheath. Covering by spoon arm, all mounted on a parallelogram ± 10mm.